Over Equipment in Wind Farms Maintaining Grid ConnectionPower

Authors

  • António Brito EDP Serviço Universal SA, the Portuguese Last Resort Supplier, Avenida Urbano Duarte 100, 3030-215 Coimbra, Portugal Author
  • Luís Neves EDP Serviço Universal SA, the Portuguese Last Resort Supplier, Avenida Urbano Duarte 100, 3030-215 Coimbra, Portugal Author

Keywords:

Wind Energy, Over-Equipment, Telemetering, Energy Price

Abstract

Over-equipment in wind farms maintaining grid connection power is a new sustainable procedure that is allowing the increase of energy producing in wind farms.In Portugal, one of the fundamental lines for the structural
modernization of the country is the pursuit of an energy strategy focused on increasing electricity production through renewable energy.


In a wind farm the probability of all wind turbines running at full power and at the same time is very low. However, it is necessary to respect the maximum power of connection to the grid, which is established in the Production License issued by the General Direction of Energy and Geology. In this way a wind farm can be upgraded to 20% of its installed capacity, considering that not all wind turbines will be running at full power and at the same time. So, an additional power of 20% of the installed capacity can be used, increasing the profitability of the wind farm and the production of renewable energy. This energy produced by over-equipment is paid at 60 €/MWh. There is a measurement system to count that energy. The percentage of 20% has implicit statistical studies, which have been developed by the Portuguese Association of Renewable Energies.
The Portuguese legal regime applicable to the exercise of the activities of production, transportation, distribution and commercialization of electricity, namely concerning the concepts of production in ordinary regime and production in special regime, is established in Decree-Law number 215-B/2012, of October the 8th, which can be consulted through the internet site of the Last Resort Supplier [1]. This decree-law reinforced the legal regime applicable to the production of electricity under a special regime, namely through renewable energy sources. Under these circumstances the power emitted by wind farms is monitored through dispatch centers and compared with the maximum power connected to the grid. If the power exceeds the connection power, the power emitted by the wind farms will be reduced to the limit allowed. In this way, the production of renewable energy became more profitable, because there is a surplus of energy that can be produced without exceeding the limit of
maximum connection power to the network.

Author Biographies

  • António Brito, EDP Serviço Universal SA, the Portuguese Last Resort Supplier, Avenida Urbano Duarte 100, 3030-215 Coimbra, Portugal

    António Brito, EDP Serviço Universal SA, the Portuguese Last Resort Supplier, Avenida Urbano Duarte 100, 3030-215 Coimbra, Portugal

  • Luís Neves, EDP Serviço Universal SA, the Portuguese Last Resort Supplier, Avenida Urbano Duarte 100, 3030-215 Coimbra, Portugal

    António Brito, EDP Serviço Universal SA, the Portuguese Last Resort Supplier, Avenida Urbano Duarte 100, 3030-215 Coimbra, Portugal

Downloads

Published

2020-01-20